Our Projects
Project Description
Fabrication and erection of steel used in the structure of the building consisting of (3,436) pieces for (~250 tons)
Location
Maple Lawn Office Building
Project Type
Structural Steel, miscellaneous & omamental metals
End Market
Commercial Office
Duration
15 Months
Project Description
Fabrication and erection of (8,240) pieces for (~760 tons) of steel as well as precast concrete panels
Location
PEPCO White Flint Substation
Project Type
Structural Steel and Miscellaneous Metals
End Market
Utility/Substation
Duration
26 Months
Project Description
Fabrication and erection of (8,211) pieces for (~1,108 tons) of steel as well as precast concrete panels
Location
PEPCO Mt. Vernon Substation
Project Type
Structural Steel and Miscellaneous Metals
End Market
Utility/Substation
Duration
30 Months
Project Description
Fabrication, erection and installation of structural steel throughout the data center that consisted of (12,662) pieces for (~3,990 tons)
Location
DMV Area Data Center Buildout
Project Type
Structural Steel and Miscellaneous Metals
End Market
Data Center
Duration
36 Months
Project Description
Fabrication and erection of (~2,018 pieces) for (~93 tons) of steel and miscellaneous metals; Washington Building Congress Craftsmanship Award Winner
Location
Spy Museum, Washington D.C.
Project Type
Structural Steel and Miscellaneous Metals
End Market
Commercial
Duration
26 Months
We Are Specializing In Welding & Cutting Metals Industry
01.
Make a Quotation
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec.
02.
We Was Respond
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec.
03.
Come To Place
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec.
04.
We Working
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec.