Our Projects

Project Description

Fabrication and erection of steel used in the structure of the building consisting of (3,436) pieces for (~250 tons)

Location

Maple Lawn Office Building

Project Type

Structural Steel, miscellaneous & omamental metals

End Market

Commercial Office

Duration

15 Months

Project Description

Fabrication and erection of (8,240) pieces for (~760 tons) of steel as well as precast concrete panels

Location

PEPCO White Flint Substation

Project Type

Structural Steel and Miscellaneous Metals

End Market

Utility/Substation

Duration

26 Months

Project Description

Fabrication and erection of (8,211) pieces for (~1,108 tons) of steel as well as precast concrete panels

Location

PEPCO Mt. Vernon Substation

Project Type

Structural Steel and Miscellaneous Metals

End Market

Utility/Substation

Duration

30 Months

Project Description

Fabrication, erection and installation of structural steel throughout the data center that consisted of (12,662) pieces for (~3,990 tons)

Location

DMV Area Data Center Buildout

Project Type

Structural Steel and Miscellaneous Metals

End Market

Data Center

Duration

36 Months

Project Description

Fabrication, erection and structural modification of steel consisting of (8,100) pieces for (~900 tons) as part of a complex renovation and vertical expansion of the existing building.

Location

600 5th Street NW, Washington, D.C.

Project Type

Structural Steel and Miscellaneous Metals

End Market

Commercial Office

Duration

18 Months

Project Description

Fabrication and erection of structural steel consisting of (~800 tons) as part of the historic renovation of the Arts and Industries Building.

Location

900 Jefferson Drive SW, Washington, D.C.

Project Type

Structural Steel and Miscellaneous Metals

End Market

Museum / Cultural Institution

Duration

18 Months

Project Description

Fabrication and erection of (~2,018 pieces) for (~93 tons) of steel and miscellaneous metals; Washington Building Congress Craftsmanship Award Winner

Location

Spy Museum, Washington D.C.

Project Type

Structural Steel and Miscellaneous Metals

End Market

Commercial

Duration

26 Months

How We Work

We Are Specializing In Welding & Cutting Metals Industry

01.

Make a Quotation

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec.

02.

We Was Respond

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec.

03.

Come To Place

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec.

04.

We Working

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec.

Scroll to Top

Historic Renovations

Vertical Integration